Coverage where the map goes blank.

A rural broadband proposal for Cascadia Telecom, from Orbitline.

48satellites
1.2Mhomes reached
$310Mten-year contract
Orbitline for Cascadia Telecom. Proposal issued October 2026.A Closewell Studio example. Companies and figures are fictional.

Three lines from your RFP set the plan.

We read Cascadia's request for proposal, the state grant filing and last quarter's investor call. These are the sentences we built everything around.

1.2 million homes in our footprint have no wired option and no plan to get one.

RFP section 2.1, the need

We can't trench 214,000 square miles of mountain and forest before the grant deadline.

Dana, Chief Executive, investor call, August 2026

Whatever we buy has to run under the Cascadia name, inside our network, on our bills.

RFP section 4.3, integration
1.2Mhomes with no wired broadband option
38counties in Cascadia's footprint
214,000square miles of mountain, forest and range
Dec 2029final deadline on the state grant

Watch the blank map fill, launch by launch.

Coral is every service cell in your footprint with no broadband today. Drag the launch clock and six orbital planes come online, each one filling a valley. Tap any cell for its homes and the month it connects.

Launch clockDec 2026Contract signed. The map as it is today.
0blank homes connected
0satellites in orbit
0blank cells left
0percent of the region covered
No broadband todayCascadia service todayConnected by Orbitline

1,200,000 homes. Every one on the map by March 2029.

Nine months before the state's final grant deadline, and with every interim milestone cleared early.

One path from a porch in Owl Creek to your core.

Four hops, a median of 38 milliseconds, and the traffic is back inside Cascadia's network before it touches the internet.

1 2 2 3 4 Home 550 km laser Station Core
Hop 1 of 4Median 38 ms home to core

Four people sign this. Each has a question.

We wrote each chapter for one reader, so nobody waits for a call to get their answer.

Will the blank map be gone before the grant clock runs out?

DDana, Chief Executive

Yes, by March 2029. Every one of the 1.2 million homes can order service nine months ahead of the state's December 2029 deadline. We fill the valleys in the order that connects the most homes soonest, so the grant's interim milestones clear early too.

Valleys in the order they connecthomes, months

Will it hold the evening peak, and is it a second network to run?

MMateo, Chief Technology Officer

It holds the peak through 2036 on the capacity we'd sign, measured against your own demand forecast. And it isn't a second network. Traffic enters your core at two sites, your OSS sees every terminal, and alarms raise tickets in your queue.

Evening demand per home against capacity, Mbps

What's fixed, and when does money leave?

PPriya, Chief Financial Officer

The whole price is fixed for ten years, with no indexation and no usage charges. After the signing payment, money only moves when a launch reaches orbit and its satellites pass in-orbit testing. If a launch fails, you pay nothing for that phase until the replacements pass.

Payments by year at the price you've configured$310,000,000

Does every license and grant date have margin?

RRuth, Head of Regulatory Affairs

Every one. The dates below come from the same model as the coverage map, so if the launch plan moves, this table moves with it. We also carry the spectrum coordination filings and the state's quarterly speed-test reporting.

Priced by the line, divided by the home.

The constellation is the same in every configuration. Everything else is a line you can change or drop, and each one says what you give up.

The constellation

48 satellites in six planes, six launches, four ground stations, Reach capacity, network operations for ten years and the 2033 refresh satellites.

In every configuration
$238,300,000

Capacity tier

Drop to Reach and evening speeds fall short of your own forecast from 2032.

Extra ground stations

Drop to the four in the base and Ferris Gap and Teal Basin share one station between them.

2

Customer terminal subsidy

Drop it and every home pays $211 for a terminal. Your survey puts year-one take-up at 27 percent instead of 41.

Launch insurance

Drop it and a failed launch costs Cascadia about $31M in replacement satellites, and that valley waits nine months longer.

Enterprise backhaul

Leave it out and your rural cell sites keep their microwave leases. It can be added at this price until the end of 2028.

What we'd sign.

Plus capacity, six ground stations, 300,000 subsidized terminals and launch insurance, for $310,000,000. Plus is the smallest tier that clears your 2036 evening peak. Six stations is the point where one storm can't take a valley down. We'd leave enterprise backhaul for a second conversation in 2028, when your microwave leases come up and the network is already proving itself.

From signature to a full map in 27 months.

Then eight years of running it, with a satellite refresh in 2033 already in the price.

Sign

  • 20 Nov 2026Letter of intent holds launch slot one
  • Dec 2026Contract signed and the first payment made

Ground

  • Feb 2027Station permits filed in six counties
  • May 2027Six ground stations live and tied into your core
  • Jun 2027Your field technicians trained on terminals

Launch

  • Jul 2027 to Oct 2028Six launches, one every three months, eight satellites each
  • After each launchTwo weeks of in-orbit testing before any payment

Fill

  • Aug 2027First homes connect
  • Jun 2028Grant milestone one cleared
  • Mar 2029The last blank cell lights up

Run

  • 2029 to 2036Operations at 99.5 percent monthly availability
  • 2033Refresh satellites launched, already priced
  • Dec 2036Contract ends, with an option to extend

The terms, in plain words.

The full contract runs to 140 pages. These are the six things it says.

The price is fixed

The total you choose above is the total for ten years. No indexation, no usage charges and no fee per subscriber. It only changes if you ask for a change in writing.

When money moves

8 percent at signing, 10 percent when the ground stations are live, 9 percent per launch once its satellites pass testing, 8 percent at full coverage, then 2.5 percent a year for operations from 2030.

If a launch fails

With launch insurance, replacement satellites are built and flown at our cost and that valley's phase moves back about nine months. Your payment for that launch waits until the replacements pass testing.

Service levels

99.5 percent availability every month, measured cell by cell. Miss it in any cell and that month's operations payment drops by the credit set out in schedule 6.

Who owns what

Cascadia owns the customers, the brand, the data and every subsidized terminal. Orbitline owns, insures and operates the satellites and ground stations.

Ending early

Either side can end the contract for cause. Cascadia can also end it for convenience after year five, with twelve months' notice and a fee equal to one year of operations.

What we don't know yet.

Will the state count satellite homes toward the grant's speed test?

We filed a test plan with the state broadband office in September and a ruling is due in January. If the answer is no, the grant share of this project needs a new home, and we'd rather plan that with you now than in February.

Who fits the terminals?

The price assumes your field technicians, trained by us in June 2027. If you'd prefer our crews, it adds about $58 a home, and we'll price it as a line.

Do Ferris Gap and Teal Basin approve the station sites?

Both need county zoning approval, with hearings set for March 2027. We hold a backup site in each county, about 20 miles from the first choice.

Is 41 percent take-up right?

It comes from your own 2025 household survey. If year one comes in lower, the terminal subsidy is the line to revisit, and nothing else in the plan moves.

Hold launch slot one by 20 November.

Our launch provider releases unbooked slots on 1 December. Slot one is held in Cascadia's name until 20 November. A signed letter of intent keeps it, and the contract follows in December.

Ask us a question

Your team at Orbitline. Elena, account lead. Marcus, mission director. Joy, network integration.